Shofu All Ceramic Preparation Kit (17pcs)

Shofu All Ceramic Preparation Kit (17pcs)

Brand: SHOFU
Product Code: Ceramic Preparation Kit
Availability: In Stock
Viewed 3924 times
  • A careful selection of a total of 17 burs for speedy, simple and accurate all-ceramic preparation work
  • 2 specially designed depth cutting burs to achieve precise depth orientation grooves for accurate labial reduction during crown and veneer preparation
  • Sequenced grades of 2 grits
  • Regular:(no marking on the shank) Super-Fine:(yellow band on the shank)
  • All 17 burs are placed in a hygienically organized bur stand for convenient storage and easy replacement.

TECHNICAL SPECIFICATIONS :

  • Maximum recommended speed for the burs:
  • Less than 300,000 rpm: 0825, 0833, 0836, 0839, 0896, 808V, 825V, 833V, 825V, 893V
  • Less than 160,000 rpm: 0826, 0893, 826V, 893V
  • Less than 120,000 rpm: 0897, 0899, 899V
  • Recommended load: 0-0.8 N

Shofu All Ceramic Preparation Kit consist of :-

  • 17pcs of Diamond Points FG in 2 different grits (Regular & Superfine)


Preparation system for all-ceramic restorations.

The assortment of the 17 instruments is ideally suited for the preparation of the anterior area, for the preparation of premolars and molars as well as the inlay and facet preparation. The shapes of the abrasives are optimally designed for the aspired preparation, ensuring a shape congruent performance.

The All Ceramic Preparation kit is specially created with an exclusive range of diamond burs for simple, efficient and accurate tooth preparation for full-ceramic, inlay/onlay and veneer restorations.

The special selection of 17 burs are created for clinical application in :

  • 896 , 897: Specially designed burs for the preparation of depth orientation grooves.
  • 896 - 0.5mm depth for all ceramic laminate veneer preparation.
  • 897 - 1.0mm depth for anterior tooth, all ceramic crown preparation.
  • 0836 , 836V: Designed to prepare the anterior tooth, buccal surface of upper and lower pre-molar or cervical area on the lingual surface. Use 1/2 - 2/3 of the diameter, Head length 9mm, diameter 1.3mm with tapered angle of 4°.
  • 0839 , 839V: Designed to prepare buccal and lingual surfaces of upper and lower molar teeth. For cervical area use 2/3 of the diameter. Head length 9mm, diameter 1.5mm with tapered angle of 20°.
  • 0893 , 893V: Designed for cutting upper / lower anterior tooth on lingual surface (to maintain occlusal space) and lower pre-molar on occlusal area. Head length 4.9mm.
  • 0899 , 899V: Designed to reduce an upper pre-molar and the occlusal surface of an upper/ lower molar to maintain the occlusal space. Tapered 20° angle.
  • 808V: Use this diamond bur after the preparation is finished to eliminate the free enamel in the cervical area. Use a lower speed to avoid chipping the enamel. Head length 8mm.
  • 0833 , 833V: Designed to slice cut at the interproximal surface or box preparation at the interproximal surface of class II inlay restoration. Use ½ the diameter, except when preparing the lingual cervical area of a lower anterior tooth use 2/3 the diameter. Head length 9mm, diameter 1.1mm (at the top of working part) with tapered 4° angle.
  • 0825, 825V,0826, 826V: Designed to prepare the occlusal box-form of an upper / lower pre-molar and molar.
  • 0826, 826V: Used for occlusal box-form for upper and lower molar. Head length 3.5mm, diameter 1.5mm and 2mm with tapered 20° angle.

Write a review

Note: HTML is not translated!
    Bad           Good

When you order from opencartworks.com, you will receive a confirmation email. Once your order is shipped, you will be emailed the tracking information for your order's shipment. You can choose your preferred shipping method on the Order Information page during the checkout process.

The total time it takes to receive your order is shown below:

The total delivery time is calculated from the time your order is placed until the time it is delivered to you. Total delivery time is broken down into processing time and shipping time.

Processing time: The time it takes to prepare your item(s) to ship from our warehouse. This includes preparing your items, performing quality checks, and packing for shipment.

Shipping time: The time for your item(s) to tarvel from our warehouse to your destination.

Shipping from your local warehouse is significantly faster. Some charges may apply.

In addition, the transit time depends on where you're located and where your package comes from. If you want to know more information, please contact the customer service. We will settle your problem as soon as possible. Enjoy shopping!